Ministry of Power
Sr No |
Date |
Title |
Download / View |
1. |
21.05.2021 |
Order- National Committee on Transmission (NCT)-amendment. |
|
2. |
16.05.2021 |
Extension of date for submitting comments on draft NEP 2021 till 25th May, 2021 |
|
3. |
03.05.2021 |
Letter to States and SERCs regarding timely issuing of the Tariff Orders under EA, 2003 |
|
4. |
27.04.2021 |
Inviting suggestions on draft NEP 2021 |
|
5. |
09.04.2021 |
Draft Electricity (Rights of Consumers) (Amendment) Rules, 2021 for comments |
|
6. |
25.03.2021 |
Reduction in Contract Performance Guarantee for TBCB transmission projects in line with Department of Expenditure's OM dated 12.11.2020 |
7. |
23.03.2021 |
Guidelines for enabling Discoms to either continue or exit from the PPA after completion of PPA term |
|
8. |
23.03.2021 |
Three O.M. bid eligibility reg.-
|
|
9. |
15.03.2021 |
Adoption of TBCB for intra-State transmission projects |
|
10. |
10.03.2021 |
The division and demerger of CTU and PGCIL Transfer Scheme, 2021 |
|
11. |
01.03.2021 |
Electricity (Late Payment Surcharge) Rules, 2021 |
|
12. |
06.02.2021 |
Amendments - Guidelines for TBCB Process for Procurement of RTC from Grid Connected Renewable Energy Power Projects, complemented with Power from any other source or storage |
|
13. |
19.01.2021 |
Waiver of ISTS charges and losses on transmission of electricity generated from solar and wind sources of energy |
|
14. |
01.01.2021 |
Electricity (Rights of Consumer) Rules, 2020 |
|
15. |
18.11. 2020 |
Testing of all equipment, components, and parts imported for use in the power Supply System and Network in the country to check for any kind of embedded malware/trojans/cyber threat. |
|
16. |
10.11.2020 |
Amendment-" Equity lock-in period" as mentioned in the SBDs for selection of TSP through TBCB Process to establish ISTS projects. |
|
17. |
06.11.2020 |
Amendment-" Equity lock-in period" as mentioned in the SBDs for selection of TSP through TBCB Process to establish ISTS projects. |
|
18. |
05.11.2020 |
Amendment – Guidelines for TBCB for procurement of RTC power connected from Grid connected to RE power projects, complemented with Power from coal-based projects |
|
19. |
08.10.2020 |
Draft Electricity (Late Payment Surcharge) Rules, 2020 for comments |
|
20. |
01.10.2020 |
Draft Electricity (Change in Law, Must-run status, and other Matters)) Rules, 2020 for comments |
|
21. |
09.09.2020 |
Draft Electricity (Rights of Consumers) Rules, 2020 for comments |
|
22. |
02.09.2020 |
Liquidity infusion scheme to alleviate financial stress due to COVID-19- Relaxation in Working Capital Limit imposed under UDAY. |
|
23. |
31.08.2020 |
Minutes of the Conference of Power and Renewable Energy Ministers of States & UTs held on 3rd July 2020 (Through VC) |
|
24. |
05.08.2020 |
Order reg. Waiver of ISTS charges and losses on transmission of the electricity generated from solar and wind sources of energy under Para 6.4 (6) of the revised Tariff Policy, 2016 |
|
25. |
25.07.2020 |
Notification – Guidelines for TBCB for procurement of RTC power connected from Grid connected to RE power projects, complemented with Power from coal-based projects |
|
26. |
23.07.2020 |
Order reg. ‘Make in India’ and ‘Atmanirbhar Bharat’ through phased wise indigenisation in Power sector |
|
27. |
16.07.2020 |
Guideline for payment of compensation regarding ROW for Transmission lines in urban areas |
|
28. |
01.07.2020 |
Minutes to minute programme containing agenda points for discussion on Conference of Power and RE ministers of States & UTs |
|
29. |
27.04.2020 |
Extension of time seeking comments on Draft EA Bill 2020. |
|
30. |
20.04.2020 |
Construction activities in the power plants during COVID-19 lockdown |
|
31. |
17.04.2020 |
Draft Electricity (Amendment) Bill 2020 for comments |
|
32. |
15.04.2020 |
Essential operation of power generation and material movement due to COVID-19 |
|
33. |
06.04.2020 |
Clarification related to Letter of Credit |
|
34. |
25.03.2020 |
Operation & Maintenance status of ISTS on 24x7 basis during COVID-19 outbreak |
|
35. |
25.03.2020 |
Essential operation of power generation and material movement due to COVID-19 |
|
36. |
02.03.2020 |
Draft Revised SBG in connection with transmission service provider through TBCB |
|
|
|
|
|
MNRE
Sr No |
Date |
Title |
Download / View |
1. |
29.01.2024 |
Clarification regarding Component ‘C’ (FLS) of Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabihiyaan (PM KUSUM) |
|
2. |
24.01.2024 |
Updated (24.01.2024) List-I under ALMM order for Solar PV Modules |
|
3. |
17.01.2024 |
Comprehensive guidelines for implementation of Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme |
|
4. |
17.01.2024 |
Constitution of Repowering Committee |
|
5. |
16.01.2024 |
Scheme Guidelines for Implementation of Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme Component-II (under Mode-2A) |
|
6. |
16.01.2024 |
Scheme Guidelines for Implementation of Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme Component-II : (under Mode-2B) |
|
7. |
12.01.2024 |
Setting up of a Dispute Resolution Mechanism to consider the unforeseen disputes between Renewable Energy Power Developers/ EPC Contractors and SECI/ NTPC/ NHPC/ SJVN/ any other Renewable Energy |
|
8. |
04.01.2024 |
New Solar Power Scheme (for PVTG Habitation / Villages) under PM JANMAN |
|
9. |
01.01.2024 |
Setting up of a Dispute Resolution Mechanism to consider the unforeseen disputes between Renewable Energy Power Developers/ EPC Contractors and SECI/ NTPC/ NHPC/ SJVN/ |
|
10. |
8.05.2021 |
Request for comments on specifications and testing procedures for solar off grid applications - regarding |
11. |
13.05.2021 |
Time extension for RE projects due to second surge of COVID-19 |
12. |
11.05.2021 |
Clarification on implementation of ALMM Order,2019 |
|
13. |
10.05.2021 |
Amendment- Guideline for CPSU Scheme Phase II |
|
14. |
29.04.2021 |
Guidelines for PLI Scheme ‘ National Programme on High Efficiency Solar PV Modules’ |
|
15. |
29.03.2021 |
Clarification wrt Time Extension to RE Projects impacted due to COVID-19 lockdown. |
|
16. |
10.03.2021 |
BCD Imposition on Solar PV Cells & Modules/ Panels |
7. |
10.02.2021 |
Implementation-ALMM order 2019 and publication of List -I for Solar PV Modules |
|
8. |
26.02.2021 |
Discontinuation of Concessional Customs Duty benefit in respect to imported items for setting up of Solar power projects |
|
9. |
09.02.2021 |
Clarification- Time Extension in SCOD of RE projects considering COVID-19 induced disruption. |
|
10. |
04.02.2021 |
Highlights- Budget 2021-22 |
|
11. |
03.02.2021 |
Amendment- ALMM Order 2019 |
|
12. |
03.02.2021 |
Amendment - Guidelines for enlistment under ALMM Order, 2019 |
|
13. |
27.01.2020 |
Notification -Extension of Self Certification for SPV inverters in MNRE Quality control order 2017 up to 30th June 2021 |
|
15. |
11.12.2020 |
Request for Comments on Draft Tender for Component B of PM- KUSUM Scheme |
|
16. |
08.12.2020 |
Clarification - Dispute Resolution Mechanism between RE developers and RE implementing agencies. |
|
17. |
04.12.2020 |
Guidelines for Implementation of Feeder Level Solarisation under Component C of PM-Kusum Scheme |
|
18. |
13.11.2020 |
Concept note for development of wind park I wind solar hybrid park — reg. |
|
19. |
09.11.2020 |
Scale-up and expansion of PM-KUSUM scheme |
|
20. |
09.11.2020 |
Circular- 3rd Edition of RE Invest |
|
21. |
25.09.2020 |
Exemption of BIS certificate to SPV module manufacturers with production capacity less than 50MW under MNRE Quality Control order 2017 |
|
22. |
22.09.2020 |
Implementation Plan, Road Map And Institutional Framework for Implementing “One Sun One World One Grid”, dated 27.05.2020 |
PGCIL
Sr No |
Title |
Download / View |
1. |
Resource page |
APTEL
Sr No |
Title |
Download / View |
1. |
Resource Link |
NTPC
Sr No |
Title |
Download / View |
1. |
List of RE commissioned projects |
NHPC
Sr No |
Title |
Download / View |
1. |
Resource page |